Blog Maintenance & Troubleshooting
Essential Inspection and Maintenance Plan for EDM and Wire EDM Machines
1 min read
Short Answer
EDM and Wire EDM Machines maintenance planning should link inspection, cleaning, lubrication and adjustment to asset criticality, operating hours and condition, with limits, ownership, records, escalation and spares.
Before each shift
Check safety, cleanliness, leaks, abnormal sound or vibration and work-zone condition under manufacturer instructions. Stop for unsafe conditions.
Weekly
Review consumables, fastening, guarding, fluids or lubrication and deeper cleaning according to the manual and use.
By operating hours
Convert manufacturer recommendations into hour-based work orders. Do not change intervals, lubricants or procedures without technical approval.
Quality as an early signal
If the path is through-cut and wire can pass, wire EDM is a strong candidate. Blind cavities and electrode-transferred shapes usually point to sinker EDM.
Records and escalation
Include wire or electrode, filters, dielectric, power, programming, supervision and maintenance, then compare cost per good part.
Measures
Track on-time PM, MTBF, MTTR, repeat failure, downtime, maintenance cost and output quality.
Frequently Asked Questions
Who owns follow-up?
A named process owner with periodic management review.
What proves success?
Documented improvement in outcomes, not activity completion alone.
When should the plan be reviewed?
Monthly at first, then by criticality, change and results.
Next Step
Share your part, material, target output and site requirements with SAKKARY MACHINERY for a technical review of EDM and wire EDM machines.
Need a machine, tooling or a service visit?
Request a price